Methanisation project: Teréga accompanies you at every stage

Do you want to contribute to the energy transition by turning your organic waste into biomethane? Teréga helps you develop your methanisation project, from the original study to injection into the gas grids. Our teams are attentive to your needs and provide support to you throughout the key stages of your biomethane project.

How to prepare your methanisation project properly?

The first stage of your biomethane production project is to check the eligibility of your future facility, both in terms of production capacity and location. These 2 pieces of information are necessary to carry out the feasibility studies.

Simulate your biomethane production capacity

Biomethane is a green gas produced from organic matter. Depending on the waste you intend to use as inputs (agricultural, food industry or household waste, sewage sludge, etc.) and its quantity, you will be able to produce more or less biomethane. These organic materials each have a different methanogenic potential.

Teréga provides a simulator that allows you to estimate your biomethane production capacity according to the quantity of your different inputs.

Locate your methanisation project

The feasibility of your project also depends on the distance between your methanisation site and the gas grid. Indeed, your facility will need to be connected for the biomethane to be injected into the gas grids. Depending on where you plan to set up your methanisation unit, more or less significant network adaptation work will have to be planned by your local grid operators.

The gas operators have drawn up a grid map to allow biomethane project holders in France to visualise those areas most favourable for injection. The purpose of this map is to encourage the injection of biomethane into the grids, but it is only an indicator. Whether you are located in a more or less favourable area, only the feasibility studies will validate or otherwise implementation of your methanisation project.

Make your methanisation project a reality with Teréga

Have you determined the location of your site and its biomethane production capacity? Contact us so we can study and make your methanisation project a reality!

How will we support you? Before the final injection phase in our gas grid, four essential stages are necessary to be able to put a methanisation project into service:

The key steps in connecting up your methanisation project

Do you have an agricultural methanisation project?

Are you planning to install a methanisation unit on your farm? Discover the benefits that renewable energy production can bring to the farming world and develop your project with Teréga.

Find out more